Worth watching · Calgary

2 story 3 units Rowhouse with garages

904 SORA BV SE · HOTCHKISS

Location context

Project location

Mapped from the public-record address when this page loads. Confirm the official record before visiting.

Locating 904 SORA BV SE…

Checking the project address against Calgary map data…

Open in OpenStreetMap ↗
Construction Brief interpretation

Why this matters

OpportunityWorth watching
Estimated project typeResidential
Estimated current stageBuilding permit application
Likely commercial windowMajor-trade estimatingNow to approximately 4 months
Commercial-window confidence Medium confidence
Record-link confidenceHighAddress-only association; verify the related records

The source indicates new-build or major building scope at permit application; trade estimating may be active, but no procurement date is published.

Evidence behind the ranking

  • Project is still early enough for preconstruction follow-up
  • New or changed public record this week
  • 41 related public records linked to this project
  • Applicant identified in a public record

Relevant trades

HVAC and mechanical

Rule-matched new construction or addition

Medium confidence
Plumbing

New-build or multi-unit scope commonly includes plumbing work.

Low confidence · Now to approximately 4 months
Electrical

Rule-matched new construction or addition

Medium confidence
Concrete

The public description indicates new-build, addition, or structural scope.

Medium confidence · Now to approximately 4 months
Append-only history

Project timeline

  1. Verified fact

    Building permit field changed

    Issued At: not stated → 2026-10-05T06:00:00+00:00

    First detected Oct 7, 2026 Official record ↗
  2. Verified fact

    Building permit field changed

    Issued At: not stated → 2026-10-05T06:00:00+00:00

    First detected Oct 7, 2026 Official record ↗
  3. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,DECK,PORCH

    First detected Oct 7, 2026 Official record ↗
  4. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Oct 7, 2026 Official record ↗
  5. InterpretationHigh confidence

    Construction Brief assessment

    Project assessed as general activity at building permit application

    First detected Sep 30, 2026 Underlying source ↗
  6. Verified fact

    Building permit reactivated

    Building permit left hold status and returned to listings.

    First detected Sep 30, 2026 Official record ↗
  7. Verified fact

    Building permit field changed

    Status: hold → in_review

    First detected Sep 30, 2026 Official record ↗
  8. Verified fact

    Building permit field changed

    Issued At: not stated → 2026-09-25T06:00:00+00:00

    First detected Sep 27, 2026 Official record ↗
  9. Verified fact

    Building permit field changed

    Issued At: not stated → 2026-09-25T06:00:00+00:00

    First detected Sep 27, 2026 Official record ↗
  10. Verified fact

    Building permit field changed

    Issued At: not stated → 2026-09-24T06:00:00+00:00

    First detected Sep 26, 2026 Official record ↗
  11. Verified fact

    Building permit field changed

    Issued At: not stated → 2026-09-24T06:00:00+00:00

    First detected Sep 26, 2026 Official record ↗
  12. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Sep 27, 2026 Official record ↗
  13. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Sep 27, 2026 Official record ↗
  14. Verified fact

    Building permit field changed

    Status: in_review → hold · 1 more field changed

    First detected Sep 25, 2026 Official record ↗
  15. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Sep 26, 2026 Official record ↗
  16. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Sep 26, 2026 Official record ↗
  17. Verified fact

    Building permit issued

    Building permit issued: Garage

    First detected Sep 25, 2026 Official record ↗
  18. Verified fact

    Building permit field changed

    Issued At: not stated → 2026-09-21T06:00:00+00:00

    First detected Sep 23, 2026 Official record ↗
  19. Verified fact

    Building permit field changed

    Issued At: not stated → 2026-09-21T06:00:00+00:00

    First detected Sep 23, 2026 Official record ↗
  20. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Sep 23, 2026 Official record ↗
  21. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Sep 23, 2026 Official record ↗
  22. Verified fact

    Building permit application

    Building permit application: Garage

    First detected Aug 18, 2026 Official record ↗
  23. Verified fact

    Building permit application

    Building permit application: SEMI-D,DECK,PORCH

    First detected Aug 18, 2026 Official record ↗
  24. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Aug 18, 2026 Official record ↗
  25. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Aug 18, 2026 Official record ↗
  26. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Aug 18, 2026 Official record ↗
  27. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Aug 18, 2026 Official record ↗
  28. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Aug 18, 2026 Official record ↗
  29. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Aug 18, 2026 Official record ↗
  30. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Aug 18, 2026 Official record ↗
  31. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Aug 18, 2026 Official record ↗
  32. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Aug 18, 2026 Official record ↗
  33. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  34. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  35. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  36. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  37. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  38. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  39. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  40. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  41. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  42. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  43. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  44. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  45. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  46. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  47. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  48. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  49. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  50. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  51. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  52. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  53. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  54. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  55. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  56. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  57. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  58. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  59. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  60. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  61. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  62. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  63. Verified fact

    Permit completed

    Permit completed: New 4 Unit 2 Story Rowhouse

    First detected Jul 29, 2026 Official record ↗
  64. Verified fact

    Permit completed

    Permit completed: New 4 Unit 2 Story Rowhouse

    First detected Jul 29, 2026 Official record ↗
  65. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  66. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  67. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  68. Verified fact

    Permit completed

    Permit completed: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  69. Verified fact

    Permit completed

    Permit completed: New 4 unit 2 story rowhouse

    First detected Jul 29, 2026 Official record ↗
  70. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  71. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  72. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  73. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  74. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  75. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  76. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  77. Verified fact

    Building permit issued

    Building permit issued: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  78. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  79. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  80. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  81. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  82. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  83. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  84. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  85. Verified fact

    Building permit application

    Building permit application: SEMI-D,PORCH

    First detected Jul 29, 2026 Official record ↗
  86. Verified fact

    Building permit issued

    Building permit issued: 2 story 3 units Rowhouse with garages

    First detected Jul 29, 2026 Official record ↗
Official evidence

Related public records

SourceRecordRecord dateRetrievedEvidence
City of CalgaryCalgary Building PermitsBuilding permit field changedBP2026-15339Oct 6, 2026Oct 7, 2026Official source ↗
City of CalgaryCalgary Building PermitsBuilding permit field changedBP2026-15338Oct 6, 2026Oct 7, 2026Official source ↗
City of CalgaryCalgary Building PermitsBuilding permit reactivatedBP2026-15340Sep 29, 2026Sep 30, 2026Official source ↗
City of CalgaryCalgary Building PermitsBuilding permit field changedBP2026-15333Sep 26, 2026Sep 27, 2026Official source ↗
City of CalgaryCalgary Building PermitsBuilding permit field changedBP2026-15332Sep 26, 2026Sep 27, 2026Official source ↗
City of CalgaryCalgary Building PermitsBuilding permit field changedBP2026-15327Sep 25, 2026Sep 26, 2026Official source ↗
City of CalgaryCalgary Building PermitsBuilding permit field changedBP2026-15326Sep 25, 2026Sep 26, 2026Official source ↗
City of CalgaryCalgary Building PermitsBuilding permit field changedBP2026-15329Sep 22, 2026Sep 23, 2026Official source ↗
City of CalgaryCalgary Building PermitsBuilding permit field changedBP2026-15328Sep 22, 2026Sep 23, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2026-15335Aug 19, 2026Aug 20, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2026-15334Aug 19, 2026Aug 20, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-16534Jul 13, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-16518Jul 13, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-16506Jul 13, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-16159Jul 13, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-16158Jul 13, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-16533May 19, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2026-05827May 17, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2026-05826May 17, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-16517May 17, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-16505May 13, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2026-04520Apr 25, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2026-04519Apr 25, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2026-04729Apr 19, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2026-04728Apr 19, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2026-04509Apr 19, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2026-04508Apr 19, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-10072Apr 5, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-10071Apr 5, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-10015Mar 18, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-10014Mar 18, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-06108Feb 19, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-06107Feb 19, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-02049Feb 1, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-01884Jan 28, 2026Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-02326Nov 16, 2025Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-02325Nov 16, 2025Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-02320Nov 16, 2025Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-02319Nov 16, 2025Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2024-14095Nov 13, 2025Jul 29, 2026Official source ↗
City of CalgaryCalgary Building Permitsbuilding_permit · record_updatedBP2025-10403Aug 11, 2025Jul 29, 2026Official source ↗
Calgary pilot

Want this Calgary feed by trade and value each morning?

Request pilot access
Corrections

Report an error

Submit supporting detail privately. Contact information is not displayed publicly.