Changes to site plan: dwelling unit, manufacturing of materials, goods or products (new sidewalk…
1015 11 ST SE · INGLEWOOD
Confirm the applicant and consultants before the project reaches building-permit issuance.
A development application is active, when design-team and specification outreach may still be timely.
Verify the latest status with the official source or project team before acting.
Why this matters
A development application often precedes detailed permit and trade procurement work.
Evidence behind the ranking
- Early-stage signal: development application
- New or changed public record this week
- Applicant identified in a public record
Relevant trades
The public description indicates new-build, addition, or structural scope.
Medium confidence · Approximately 1 to 4 monthsNew-build or multi-unit scope commonly includes plumbing work.
Low confidence · Approximately 1 to 4 monthsProject timeline
-
Development record updated
Development record updated: CHANGES TO SITE PLAN: DWELLING UNIT, MANUFACTURING OF MATERIALS, GOODS OR PRODUCTS (NEW SIDEWALK, WASTE ENCLOSURE); ADDITION: DWELLING UNIT, MANUFACTURING OF MATERIALS, GOODS OR PRODUCTS (MAIN AND SECOND FLOOR)
First detected Jul 29, 2026 Official record ↗ -
development_permit · cancelled_or_refused
development_permit · cancelled_or_refused: CHANGES TO SITE PLAN: DWELLING UNIT, MANUFACTURING OF MATERIALS, GOODS OR PRODUCTS (NEW SIDEWALK, WASTE ENCLOSURE); ADDITION: DWELLING UNIT, MANUFACTURING OF MATERIALS, GOODS OR PRODUCTS (MAIN AND SECOND FLOOR)
First detected Jul 29, 2026 Official record ↗
Related public records
| Source | Record | Record date | Retrieved | Evidence |
|---|---|---|---|---|
| City of CalgaryCalgary Development Permits | Development record updatedDP2022-06727 | Feb 13, 2026 | Jul 29, 2026 | Official source ↗ |
Want this Calgary feed by trade and value each morning?
Report an error
Submit supporting detail privately. Contact information is not displayed publicly.